Items where Subject is "600 Teknologi dan Ilmu-ilmu Terapan > 690-699 Teknik Bangunan > 692.5 Prakiraan Biaya Tenaga Kerja, Waktu dan Bahan-bahan"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: Thesis
Number of items at this level: 1.

Thesis

Aisyah, Dewi (2020) Analisis Pengukuran Waktu Kerja Menggunakan Metode Stopwatch pada Produk Laser Pro 190 di PT.Ht Manufacturing. Skripsi thesis, Prodi Teknik Industri.

This list was generated on Sun Dec 22 16:59:17 2024 WIB.